Death Valley CLOSED: Fall/Winter 23/24 Trip Planning
#53
Why Lippincott is planned to be graded, posted on the Saline forum earlier:

Per Mike Reynolds ( DVNP superintendent) , "Lippincott is only because the rented dozer will be at racetrack within a week. They can only do 1 or 2 miles per day! If they cut down Lippincott it means we can fix bat rock road and then steel pass sooner. Otherwise nps has to wait for south pass to be passable by a truck to bring in a dozer. The road is GONE. I'm sorry it is taking along time. It's nothing like the storms we are used to in the past unless you've been here for decades!"
DAW
~When You Live in Nevada, "just down the road" is anywhere in the line of sight within the curvature of the earth.